top of page

Local BRP Projects Under Construction


Local BRP Architect Projects under construction

Current Projects

BRP Architects has had the privilege to work on a variety of local projects that are currently under construction in and around the Springfield, MO area. During the construction process, our architects have regular meetings and site visits to assure the project is built according to the drawings and specifications and is completed on time. We believe we have a reputation among Southwest Missouri contractors as being tough but fair, and responsive. We inspect our work regularly and document every visit and observation. We are committed to a quick turnaround to drawings and submittals to ensure a good flow of construction activities.


Below you will find an update on our current local projects under construction and when they are estimated to be complete.


Dining Center Infill, Holland House Missouri State University

Construction on Holland House Dining Hall Infill Missouri State University

On this project, BRP served as the architect for the dining center infill for Missouri State’s new residence hall — Holland House. This new residence hall consists of a seven-story building with four stories of parking and three stories of living space. The dining center will be located on the ground floor.


Currently, the contractor is performing drywall finishing and grinding concrete floors in preparation for polishing, continuing MEP installation, and beginning final finishes in some areas such as installing tile and lay-in ceilings grids. They are also prepping for the installation of the kitchen exhaust hood system and food service equipment.


Estimated Completion: November 2020


Greenwood Multipurpose Addition

Construction on Greenwood Laboratory School Multipurpose Addition
Construction on Greenwood Laboratory School Multipurpose Addition

The Greenwood Multipurpose Addition is nearing completion and is scheduled to be done by this fall.


Exterior envelope construction and interior final finishes are nearing completion. Millwork is being installed at the concession stands. The installation of flooring in the restrooms is in progress and the installation of the exterior donor signage has been completed. Construction of the plaza area along Bear Boulevard is nearing completion. The site is being prepped for landscape work, which is scheduled to begin this week.


Estimated Completion: Mid-late September 2020


Grizzly Industrial Expansion and Showroom

Grizzly Industrial Construction on Expansion

Twenty years ago, we designed and built the 150,000 sq. ft. Grizzly Industrial showroom and warehouse when they relocated to Springfield from Memphis. Soon thereafter, we added a 300,000 sq. ft. distribution center across the street. From time to time, we have added call center space and reworked various areas in the showroom.


A few years ago we expanded their warehouse with a 50,000 sq. ft. addition. This year Grizzly is expanding their showroom into the warehouse space to provide more display space for their tools. Across the street, the distribution center is expanding by adding 64,000 sq. ft. of warehouse space, more docks, and loading areas.


Estimated Completion: Late Spring 2021


Homewood Suites by Hilton Hotel

Construction on Homewood Suites by Hilton in Springfield, MO
Construction on Homewood Suites by Hilton in Springfield, MO

Construction on Homewood Suites by Hilton was delayed by rain earlier this year, pushing the original completion to April 2021. The five-story hotel will have 122 rooms and 3,500 sq. ft. of meeting space. Other features of the hotel include an indoor pool, fitness center, and community spaces.


This five-story structure was fabricated using a cold-formed steel fabrication system built off-site inside and then erected on site which allowed the construction to make up lost time.


Estimated Completion: April 2021


Legacy Bank and Trust Headquarters

Construction on Legacy Bank and Trust's New Headquarters
Legacy Bank and Trust New Headquarters in Springfield, MO

Legacy Bank and Trust’s new 40,000 sq. ft. headquarters is going skyward on 3250 East Sunshine Street. Construction on the project currently includes new corporate headquarters for Legacy Bank and Trust on the upper floors, a retail banking facility with drive-up banking on the ground floor, and the third floor is available for lease until Legacy needs it.


Estimated Completion: June 2021


Mission Ridge Senior Living

Mission Ridge Senior Living Springfield, MO Rendering

Coming South of Republic Road on Kansas Avenue is a new senior living community called Mission Ridge. The new facility will consist of: 47 Independent Living Units, 36 Assisted Living Units, and 24 Memory Care Beds. Currently they are working on the site (earthwork) and will begin the building foundation work in October.


Estimated Completion: 2021


SRC Heavy Duty Expansion

SRC Heavy Duty Expansion Springfield, MO

The SRC Heavy Duty Plant included a 166,000 sq. ft. manufacturing facility that was stretched to its capacity with some functions forced off-site.


This 93,200 sq. ft. addition will allow them to bring the off-site operations back on site, reorganized their plant operations, and increase their productivity.


Estimated Completion: End of 2020


Warson Brands Distribution Center Strafford, MO

The Warson Brands Distribution Center includes 166,000 sq. ft. designed to warehouse, distribute, and showcase the various styles of shoes and brands Warson Brands sells. The new facility will serve as the new distribution hub for the company.


Located directly across Highway 125 from the John Deere Reman Warehouse, the project is nearly enclosed and can be seen from Interstate 44.


Estimated Completion: December 2020

 

Are you looking for an architect for your next project? Give us a call at 417-865-6100 or email our Managing Partner Christopher Swan at: swan@brparc.com.


Also on the Blog:


Comments


bottom of page